Job flows

Connected tool chains for real site jobs.

Each flow links the specialist checks in the order they usually happen on site. The output is a power note, circuit plan, risk list and equipment category links.

Job flow

Site Heating Power Check

A guided flow for answering: can this site supply run the electric heaters without overheating cable reels, dropping voltage or overloading one phase?

  1. Select 13A, 16A, 32A, 63A, 110V transformer, generator or three-phase supply.
  2. Add heater kW or choose equipment presets.
  3. Run amps, transformer, cable reel derating, voltage drop, RCD leakage and phase balance checks.
Job flow

Flood Drying Electrical Plan

Turn room size, humidity and available power into a drying stack: dehumidifiers, air movers, heater support, RCD split and daily log.

  1. Enter room size, RH, temperature, wet materials and target.
  2. Size dehumidifier capacity and decide refrigerant vs desiccant.
  3. Add air movers and support heat.
Job flow

Portable AC Event & Server-Room Power Plan

Estimate cooling, start current, exhaust duct losses, condensate handling and generator demand for temporary cooling.

  1. Choose server room, event, office, kitchen or workshop.
  2. Estimate cooling kW/BTU and spot load.
  3. Check compressor start current and generator kVA.
Job flow

Warehouse Fan & Heater Balance

Link high-bay heat loss, door ventilation, destratification and temporary electric heater power into one plan.

  1. Enter warehouse volume, target temperature and door/ventilation conditions.
  2. Calculate ACH and ventilation heat loss.
  3. Estimate destratification benefit.
Job flow

Nuisance RCD Trip Diagnosis

Diagnose why drying, cooling or heating equipment trips protection: leakage budget, start current, panel map, lead condition and visual heat-risk scan.

  1. Select the symptom: immediate trip, compressor start, damp/random, cable reel or overload.
  2. Add equipment and circuit details.
  3. Run RCD leakage and MCB curve checks.
Job flow

Generator-Powered Temporary HVAC Setup

Build a generator plan for heaters, AC, dehumidifiers and fans with kVA, compressor start, voltage drop, RCD and sequencing checks.

  1. Add all planned equipment.
  2. Enter available or target generator kVA.
  3. Run running kW, surge kVA and start sequence.
Job flow

Panel Photo to EICR/Remedial Scope

Use a board photo, circuit schedule, Zs/R1+R2 values and EICR wording helpers to draft a remedial scope and temporary equipment restrictions.

  1. Upload or describe the panel photo.
  2. Build a draft circuit schedule.
  3. Check Zs/R1+R2 values.